Static system
Middle beam arched bridge
Foundation
Reinforced steel abutments on uncased pile foundation
Equipment
Steel railings, lighting pylons, steel stair construction, northern canal embankment
Design
Ingenieurbüro Grassl, construction engineering consultants, Berlin; Architect Hans-Peter Störl, Berlin
Architect: Hans Peter Störl
Execution
Civil engineering: Holzmann, Berlin
Steel construction: Victor Buyck, Belgium
|
|
Building costs
approx. DM 10 million
Construction period
1997 - 1999
Overall length
83.00 m
Bearing distance
81.00 m
Total width
24.60 m
Effective width
21.00 m
Building height
2.18 m
System height of the arch:
12.50 m
Bridge area
2,041.80 qm
|